Before digging a shocter hole, drilling with a device, or rambling in the post, you must verify the existence of safety and communication races.
We rent out a cable receiver, or a communications races, to verify the existence and route of underground line installations.
The contractor must have a continuous overview of all underground communications in the area of the works!
Any person wishing to operate in a protected zone of a line facility shall, in the 11th Ministry of Economic Affairs and Communications, December 2006. (a) In accordance with the procedure laid down in Regulation No 99, ' conditions and procedures for the operation of a line facility in a protected zone ', to apply for the holder of a line-facility authorisation.