fbpx

Inten OÜ

SWEDBANK AS
IBAN: EE902200221061048194
SWIFT/BIC: HABAEE2X

Piling up piles

 

We install piles of both metal and wood of different diameters and lengths using the method of ramming. Rammed piles can be rounded, square, rectangular or with any other profile. The maximum length of the rammed pile is 5.5 meters. It is possible to pull out a pile with a device that is incorrectly installed or deformed as a result of an accident and replace it with a new one.

 

The hydraulic piles will move on its own, and this rubber crawler, without damaging the maneuvering of the hard paved roads or platse. In addition, the crawlings give the stake-great power to good permeability, thanks to which it can circulate on any ground. Thanks to the light weight and wide range of crawfish, the turf can also be successfully moved in green areas without significantly damaging them. The precision of stake piling also ensures the mast that is movable in each direction on the bumble surfaces.

 

By pilping up piles, we can help with various installation works, such as pipe and collision partitions, fence posts, foundations for light buildings, traffic sign poles, solar panel parks poles, etc.

CALL US